吃奶呻吟打开双腿做受视频,色噜噜人体337P人体,亚洲国产成人久久综合下载,147大胆198人体毛片图

English中文簡(jiǎn)體

新聞中心

表面處理——檢修口修復(fù)的基本概況 2021-05-10

五步法,簡(jiǎn)單修復(fù)檢修口。

對(duì)于檢修口的修復(fù),有五種基本技術(shù)選項(xiàng):

? 水泥旋壓鑄造

? 聚氨酯噴霧

? 環(huán)氧噴霧

? 現(xiàn)成水泥

? 機(jī)械密封


Surface Preparation— a Fundamental Necessity for Manhole Rehabilitation


In the trenchless technology industry, we are both blessed and cursed with multiple technology options to solve essential problems. For manhole rehabilitation, there are five basic technology options:

? Cement Spincast

? Polyurethane Spray

? Epoxy Spray

? Formed-in-Place Cement

? Mechanical Seal


Get clarity on your objectives: mitigating infiltration and inflow (I&I), optimizing bench flow, restoring structural integrity, protecting against corrosion, or all the above. Choose wisely. Understand the process, validate service life expectancy and know who is performing the work because Execution is Everything.


No matter what technology or service provider you choose, nothing is more important than surface preparation to ensure longevity and prevent failures of a manhole restoration project. Nothing.


In preparing this article, investigations were made within NASSCO, SSPC, NACE, and ASTM organizations for the most current wisdom on surface preparation and learned an estimated 85 percent of coating failures are directly attributed to incorrect or inadequate surface preparation. This is one of the drivers behind the steady increase in the requirement for onsite inspection. Thorough surface preparation makes common sense, but not always common practice.


Without getting too deep into the five technology options and vendor attributes (bonded vs. unbonded, structural vs. non-structural, corrosion barrier or non-protected) it is highly recommended to follow vendor specific guidelines for surface preparation. The following five steps are fundamental for any manhole rehabilitation project, any technology, any technique:



Step 1 — Visual inspection of the substrate


In most cases, brick and mortar or precast concrete will be the surfaces that need prepared. A top-down view will reveal this, but to truly study the surface, there is no substitute to entering the structure for bottom-up investigation. Using a forensic approach, look for evidence of water stains, defects, physical damage, corrosion or chemical damage, contamination and excess moisture from the bench to the chimney.


Step 2 — Pressure washing



Pressure washing will reveal greater insight into the existing condition of the substrate. Low pressure water-blasting (4,000 to 5,000 PSI) is most common, but high-pressure (5,000 to 10,000 PSI) and high-pressure water jetting (up to 30,000 PSI) may be required. To remove previous failed material applied to the native substrate, more extreme measures include dry and wet abrasive blasting (reference SSPC-SP CAB 1-3)


Step 3 — Validate Substrate (brick or concrete)


An acceptable prepared surface should be free of contaminants, laitance, loosely adhering mortar, brick, or concrete, dust, and should provide a sound, uniform substrate suitable for the application of protective coating or lining system. (reference ASTM D4258)


Step 4 — Active Leak Correction (brick or concrete)



There are advantages and disadvantages for each of the following techniques with respect to sealing active leaks, but all rehab technologies make this a fundamental requirement.


? Injection Grouting: A hole is drilled into or near the leak site and urethane grout is injected to stop leak (older brick structures may require a more comprehensive curtain grouting technique)

? Hydraulic Cement: fast-setting mortar used to stop individual leaks (not recommended for brick structures)


Step 5 – pH Testing



pH Testing may not be required by all rehab technologies, but if so, there are three standard types of testing methods and one little known secret that is easy and inexpensive to administer:

? pH test paper

? Insta-check pH pencil

? pH meter

? Phenolphthalein—a weak, colorless acid sprayed onto a wet concrete surface. If no color is observed, the concrete surface is still acidic and additional surface preparation is necessary. If the solution turns pink in color, the pH value has reached approximately 8. At a pH of approximately 10 the solution turns a bright magenta.


No matter what technology or service provider you choose, nothing is more important than surface preparation to ensure longevity and prevent failures of a manhole restoration project. Nothing.


If you are truly interested in your manhole restoration project passing with flying colors, you’ll make certain that surface preparation is your number one priority, but only after choosing the technology, methodology, and service provider that best meets your rehab objectives. Thorough surface preparation is a fundamental necessity to the extended service life you expect of your manhole, maintenance hole, window to the collection system.


新聞中心 贊助商 合作媒體 下載中心 常見(jiàn)問(wèn)題 友情鏈接
備案號(hào):滬ICP備10040940號(hào) 電話:86-21-54791130 傳真:86-21-54791130 郵件:ITTC@CSTT.ORG, 版權(quán)所有 上??莆跷幕涣饔邢薰? 滬公網(wǎng)安備 31011702006209號(hào) 技術(shù)支持:攸攸網(wǎng)絡(luò)
亚洲精品无码久久千人斩| 久久久久久人妻精品一区二区三区| 久久精品国产成人| 成人午夜看黄在线尤物成人| 老王亚洲AV综合在线观看| 山东chinese猛一猛gay| 亚洲av片在线观看网址| 国产精品无码AⅤ精品影院| 国产一卡2卡三卡4卡免费网站| 最近免费中文字幕高清2019| 黄色视频网站在线观看| 精品推荐国产麻豆剧传媒| 亚洲国产精品久久AA片 | 在线视+欧美+亚洲日本| 国产精品自在拍首页视频8| 日日摸夜夜添夜夜添无| 狠狠躁18三区二区一区| 国产精品久久久久久av免费不卡| 亚洲熟女少妇一区二区| 日日噜噜夜夜狠狠久久| 午夜爽爽爽男女污污污网站| 天堂资源在线www中文| 久久久久久久无码高潮| 性饥渴老头XXXXⅩHD| 色婷婷六月亚洲婷婷6月| 野花高清中文免费观看视频| 无码AV高潮抽搐流白浆在线| 精产国品一二三产区草莓| 翁公小雪在厨房张开腿进出| 天天躁夜夜躁狠狠躁2021 | 四川丰满少妇A级毛片| 精品视频在线观看免费观看| 小sao货边洗澡边cao你| 永久亚洲成a人片777777| www夜片内射视频日韩精品成人 | 亚洲欧洲日产国产AV无码| 日本片在线看的免费网站| 精品国产一二三产品价格 | 国产精品一区二区久久蜜桃| 亚洲一码二码三码精华液| 美女扒开腿让男人桶爽直播|